WOOLWORTHS DISTRIBUTION CENTRE
MIDRAND | GAUTENG
RLS was approached by the CKR Consulting Engineers to supply a lighting solution for this project.
Products Supplied:
Six Kuhle Maxi 400 floodlights were supplied for each of the 30 metre masts.
Both the Istria and Kuhle floodlights were supplied for mounting on the existing car park poles and the new car park poles, where required.
Solo bulkheads were installed at a lower level of the warehouse and Kuhle floodlights at a higher level.
Nasa 2800mm lights were installed in the covered dispatch and collection areas of the warehouse.
Client: Woolworths, Electrical Engineers: CKR Consulting Engineers, Electrical Contractors: Presto Electrical contractors