SHERATON TEXTILES
DIEP RIVER | CAPE TOWN
After relocating to a new industrial facility in Diep River, it was imperative that the lighting was upgraded to meet not only the required safety standards but also for their valuable employees.
A lighting design was requested and had to achieve 300 lux. The Holda Pro was mounted at 8.3m and when we went back to the site to do a LUX level audit, the levels were exactly as designed.
Electrical Engineers: Triocon Consulting Engineers Cape Town, Electrical Contractor: Valley Electrical